After-sales Service: | Provided |
---|---|
Warranty: | 1 Year |
Type: | Coating Production Line |
Coating: | Coil Coating |
Substrate: | Steel |
Certification: | ISO |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Suppliers reviewed by inspection services.
Galvanized Steel/Steel Coil/Aluminum Coating/Metal Coating /PPGI Production /Painting / Color Coating Line
The printing production line of colored steel plate is a complete of production equipment for colored steel plate, and the process is as follows: make the steel coil strips be subject to surface degreasing, parkerising and passivating treatment, then apply multi-layer organic coatings ( e.g., coatings of modified resin (SMP), high weather-resistant polyester(HDP) , polyvinylidene fluoride (PVDF) etc. ) on the strip surface by means of continuous roller coating, next, overprint multi-color patterns, and finally compound to form new functional plates. The production line is composed of equipment of uncoiler, sewing machine, tension machine, storage machine, degreasing and washing unit, roller-coating machine, printing machine, curing furnace, shear, coiler etc..
S/N | Dimension | Parameter |
1 | Strip Dimension | |
thickness | Min. 0.2 ~ Max. 3 mm(Al) | |
Min. 0.12 ~ Max. 1.50mm(GI) | ||
Width | Min. 600 ~ Max. 1,650 mm (GI) | |
Min. 800 ~ Max. 1,800 mm (Al) | ||
2 | Coil dimension | |
Entry Inner diameter | Φ508 mm | |
Entry Outer diameter | ΦMin. 800 ~ Max. 2,000 mm | |
Entry Weight | 10 tons Max | |
Product Inner diameter | Φ508mm | |
Product Outer diameter | ΦMin. 800 ~ Max. 2,000 mm | |
Product Weight | 3tons to 10tons normally | |
3 | Line speed | |
Entry section | Max. 90mpm | |
Process section | Max. 68mpm | |
Exit section | Max. 90mpm |
1. Do you offer custom service?
Of course, most of our machines are built according to customers specifications, using top brand name components.
2. How to ensure the quality?
In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
Each component before assembly needs strictly control by inspecting personnel.
Each assembly is in charged by a master who has working experience for more than 5 years.
After all the equipment are completed, we will assembling all the machines and run parts testing for at least 12 hours to ensure the stable running in customers' factory.
3.Do you provide after-sales service?
After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools.
Suppliers with verified business licenses
Suppliers reviewed by inspection services.